Hello all,
I’m planning on making 3 render nodes and would like some advice.
I’m planning to set up the following:
Case: supermicro CSE-512L-260
Asus P8H67-M Pro revB3
Processor: intel I-7 2600K, 3,4GHZ 4cores/8threads
Cooler: ??? need advice on this one
Ram: DDR3 non ECC 1333 – 2x4GB
HD: western digital caviar blue SATA 7200rpm 500GB
Simple DVD
Win 7 pro 64 bit eng oem
TOTAL: 790 euros incl. VAT x 3 makes 2370 euros incl VAT.
My current system:
Dual intel xeon E5620 2,4GHZ – 24GB RAM – nvidia quadro fx 3800 - win7 64bit
Running 3dsmax 2011 with mentalray as renderer.
Is this the right way to go?
Are these the maximum cores for metal ray satellite with distributed bucked rendering?
Will this mean I can render at (2X2.4GHZ)+(3x3.4GHZ)= 15GHZ?
Will I be able to use my main workstation fully while the 3 nodes render in the mean while?
Will I be able to put GPU graphic cards in the nodes and use them for gpu based rendering like iray?
All information and advice welcome.
I’m really new at this and the info on the internet is I’m so fragmented losing my way here.
Thanks.