sardesign Posted June 9, 2006 Share Posted June 9, 2006 this is a project that i was working on as a concept for a client. colors, materials, shape, details are not necessarily figured out. there are three parts to the project... 1 hotel (shown in the attachments) 2 condo 3 existing shops + restaurant + bar since the project is no longer viable i figured i would push the design as far as i could... so even though it will never get built, i could test some ideas (and rendering styles). comments are always welcome as long as you understand that what you see is not necessarily the direction i'm moving in... i'll just post what i have when it gets done and hopefully it will turn into something very interesting. Link to comment Share on other sites More sharing options...
jophus14 Posted June 9, 2006 Share Posted June 9, 2006 Sounds like you have a ton of work ahead of ya. Keep posting your WIPs Link to comment Share on other sites More sharing options...
sardesign Posted June 10, 2006 Author Share Posted June 10, 2006 ...existing building blocks in place ...the metal panels on the exterior are working well as well as the cmu near the rear of the building ...still adjusting the window panels ...got some ideas for supports (and exit stairs) ...perforated panels are in the works as well as interior and exterior lighting Link to comment Share on other sites More sharing options...
sardesign Posted June 12, 2006 Author Share Posted June 12, 2006 two views... still working on hotel (no improvements on lighting as of yet). added parking garage... still deciding on full open plates or punched openings for daylighting. exterior of the hotel is perforated metal panels over cmu and a steel structure. glass exit stair underneath the cantilever. started looking at the interior of each room and the common room (at the end of the cantilever)... but not much developed as of yet. Link to comment Share on other sites More sharing options...
sardesign Posted June 14, 2006 Author Share Posted June 14, 2006 not many changes (again)... -different supports -different internal wall colors -started working on the structure and floor plates for the condo portion -no changes to the parking garage as of yet -added in subtle sky gradient -no changes to the existing buildings Link to comment Share on other sites More sharing options...
sardesign Posted June 17, 2006 Author Share Posted June 17, 2006 ...finally got the condo started. -made some construction corrections to hotel (can't be seen from exterior) -condo structure started. -mental ray lighting refined (actually tried making it look decent now) Link to comment Share on other sites More sharing options...
sardesign Posted July 31, 2006 Author Share Posted July 31, 2006 been a while since my last update... Link to comment Share on other sites More sharing options...
jophus14 Posted July 31, 2006 Share Posted July 31, 2006 looking good Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now